Design & Engineering

Temporary Works

Expert temporary works design for safety, compliance, and efficient delivery.

TEMPORARY WORKS

Safe, compliant design is the foundation of every temporary works project.

Our in-house engineers provide design solutions that meet BS 5975 and CDM regulations while ensuring works are delivered efficiently.

We work closely with contractors to develop practical, buildable solutions that balance safety, cost, and programme. Every design package includes full calculations, drawings, and risk assessments tailored to site-specific conditions.

Independent design checks at Category 2 and Category 3 are available, and our team brings hydraulic, structural, and geotechnical expertise to every project.

Temporary frame dam with pumped flow diversion maintaining river flow during civil engineering works.

What makes High Water Temporary Works Different?

Our engineers understand that temporary works in water are influenced by far more than structural loading alone. Water levels, hydraulic forces, scour, environmental constraints, constructability and operational requirements all need to be considered together. Because we design, own and install our own temporary water control systems, our designs are grounded in practical site experience as well as engineering theory.

This integrated approach results in solutions that are not only safe and compliant, but also practical to install, efficient to construct and tailored to the realities of working in challenging water environments.

01.

Designed for buildability: Our engineers develop practical solutions that balance safety, programme and cost, ensuring designs can be efficiently delivered on site.

02.

Water engineering expertise: We combine hydraulic, structural and geotechnical knowledge to develop temporary works specifically for challenging water environments.

03.

Fully compliant: Every design is produced in accordance with BS 5975 and CDM Regulations, with comprehensive calculations, drawings and risk assessments tailored to the project.

04.

End-to-end engineering support: From feasibility studies and concept design to detailed design, Category 2 and Category 3 design checks, we provide engineering support throughout the project lifecycle..

Temporary Works Applications

01

Full Design Packages

Structural calculations, drawings, and risk assessments for all temporary works.

02

Risk & Method Statements

Comprehensive risk assessments and method statements prepared to meet client and regulatory requirements.

03

Multi-Discipline Expertise

Hydraulic, structural, and geotechnical design capability under one roof.

04

Independent Design Checks

Category 2 and Category 3 independent checks to verify design integrity and compliance.

Temporary frame dam retaining water around a historic building during construction and conservation works. View Gallery
Temporary sandbag and membrane barrier installed to isolate a river and create a safe working area for engineering and maintenance works.
Temporary limpet dam installed within a harbour entrance to isolate a dock for inspection and maintenance.

Advantages of Temporary Works

Compliant with national standards and client requirements.

Related Projects

Ready to Get Started?

Request a consultation to ensure your temporary works are safe and fully compliant.

Contact Us