Cheetham Hill Construction required temporary water control to facilitate upgrade works to the debris screen at Mauldreth Road, Manchester.

The project required safe access to both sides of the channel and culvert while maintaining continuous flow through the watercourse.

With limited working space and a phased construction programme, a temporary diversion system was needed to safely manage flows while allowing each stage of the works to proceed independently.