Projects

Temporary Flow Diversion for Concrete
Channel Remediation, Staffordshire

Client

Jackson Civil Engineering

Duration

21 weeks

Location

Fowlea Brook, Stoke-on-Trent, Staffordshire

Share

Fowlea Brook required remediation works to an existing concrete channel, including the renewal of joints and application of surface treatments to extend the life of the structure

To undertake these works safely, access was required to both the channel bed and walls, necessitating the dewatering of the work area whilst maintaining flow through the watercourse.

The project presented an additional challenge as access was required across the full width of the channel. Our temporary flow diversion system therefore needed to maintain hydraulic capacity whilst allowing unrestricted access beneath and around the bypass arrangement for repair works.

Ready to start your next project?

Whether you need a temporary dam, specialist access solution or end-to-end engineering support, contact HighWater for a free consultation.

Contact Us